DCT Renewable Energy Projects Limited - Methil Docks Wind Turbine Project03/08/2010Civil Works Completed on Methil Docks
DCT Renewable Energy Projects are delighted to announce the
successful completion of the civil engineering works associated with
their Balance of Plant Contract on Methil Docks.
The project for The Hydrogen Office Limited involves all the civil
and electrical infrastructure for the erection of a 750kW Wind Turbine
Generator which is used to power a new Hydrogen Fuel System.
DCT have recently completed the civil engineering works associated
with the project which invlolved the installation of 8 nr 1200mm
diameter piles, a 2m deep pit excavation on the famous Methil Docks
and finally the steel fixing and pouring of a 100m3 RC foundation base.
Electrical works are on-going and are due to be completed by early September 2010.
Ends.